Undertaking repairs to the crest and wave wall; install rip-rap protection to the upstream end entrance of the spillway; create a new French drain to the left-hand shoulder and install 3 new V-notch weirs.
An earthworks team excavated and transfered an estimated 2,000 – 2,300 tons per day, with about 60 – 70 loads per day to a maximum distance of 2km for infilling and grading.
Client Organisation | Natural Resources Wales (NRW) |
Contract Value | £125,000 |
Role | Principal Contractor |