The purpose of the works was to replace the current rip rap protection with a more robust solution that was be able to withstand severe storm surges and tidal events.
The contract was completed ahead of time and within budget despite minimising disruption to local businesses and residents by suspending works for 2 weeks over the busy Easter period.
All material was sourced prior to commencement from nearby quarries within 5 miles to increase the sustainability of the project.
The works included the design and construction of replacement revetment defences at Newton Beach, Porthcawl.
Contract Value | £316,787.18 |
Contract Period | March to May 2015 |
Form of Contract | NEC3 Short Contract |
Grid Reference | SS836768 |
Address | Beach Rd, Newton, Porthcawl, CF36 5NE |