Stage 2 of the Port Talbot PDR link's the southern end of Stage 1C PDR/Water Street in the Port Talbot Industrial Estate, with the M4 Motorway at Junction 38 (Margam Interchange).
The route continue's parallel with Dock Road up to Oakwood Road and then cross the vacant land parallel to the railway line. The new road crosses the railway at the existing Corus entrance on Cefn Cwrgan Road, following which, it runs south east across the southern area of the Corus Sports and Social club and adjoining fields, then finally to the Junction with the M4 at Margam East.
C2 West End Relief Culvert
Construction of the C2 lined culvert to provide overflow flood relief to the Ffryd Wyllt river.
Swale & Mitigation Pond
Client | Neath Port Talbot CBC |
Principal Contractor | Costain |
Principal Designer | NPTCBC/Arup |
Contract Period | 5 months |